Skip to content
HORECAPILOT

Case studies

The first case studies are being built right now.

We would rather have this page empty than fill it with descriptions of projects that have not happened.

Expansion in progress

Living Lab project in development

The Zakopane Living Lab is under construction, and the first installations are being sourced. A case study can only be written once a solution has run a full cycle in a real property — installation, a season of use, operational data and guest reaction.

The first entries here will appear when there is something real to report.

What each case study will contain

  1. 01The problem the property had
  2. 02The solution installed
  3. 03Photographs of the actual installation
  4. 04Guest feedback
  5. 05Operational data
  6. 06Investment cost
  7. 07Return on investment
  8. 08Conclusion — including what we would do differently

What is being built right now

  • Zakopane Hospitality Living Lab

    Guest rooms and common areas are being rebuilt into a permanent demonstration environment.

    Expansion in progress
  • Bathroom Lab

    Layouts drawn, tiles and sanitary ware being selected. Refurbishment planned as one continuous stage.

    Design & sourcing
  • Hotel Sleep Lab

    Talks with mattress, topper and linen manufacturers about the first fully installed sleep set.

    Manufacturer selection
  • Private SPA

    Sauna, hammam and minipool suppliers under review for the wellness area.

    Partner selection
  • Bukowina Operations Lab

    Sourcing laundry, drying and dosing equipment for the demonstration room.

    Equipment sourcing

Come and see the Living Lab.

Visits are arranged individually — the properties are rented to guests, so we agree a date that works around bookings.